Dolonox - medical and dental gas piping equipment

Tips and Suggestions

Tips, suggestions, or comments that may be of interest to medical gas installers. Hopefully these shared bits of information will make your next project a little easier:

  • Gas-specific demand check fittings are now required for line gauges and pressure/vacuum switches.
  • Use plenty of dry, oil-free nitrogen to blow down newly-installed piping prior to having a purity test performed. We have seen too many purity tests fail and require costly re-testing because installers used too little nitrogen.
  • Install shut-off valves so that the gauge port is downline of the valve. This makes future testing and system backups much easier to perform.
  • Apply labels and direction arrows on all new piping.
  • Emergency rooms are considered "Critical Care" areas and require an area alarm.
  • Area alarm sensors for life support areas should be placed downline of the zone valve, while sensors for anesthetizing areas should be placed upline of the zone valve.
  • Remember to have your plans checked by a credentialed, professional verifier!

Send your comments, tips, and suggestions to harry@dolonox.com




home       products       tips & suggestions       projects       links
phone 425-745-9392  fax 425-741-2500  e-mail sales@dolonox.com or harry@dolonox.com

Copyright © 2003-2007  Dolonox, Inc.  All rights reserved.



Site by Blue Moose Web Works
Seattle Web design & SEO optimization

links projects current specials products home